2523 Computer Lab
- Use the stairs in the Kydd Building carpark to reach level 2 and enter the building through the double doors directly ahead.
- Pass the stairs and go down the corridor on the right. Make note of the room numbers next to the doors.
- From the main foyer of the Kydd Building, go up the stairs to level 2. Use the double doors on the right near the TV to reach the Centre of Excellence.
- (Wheelchair) From the main foyer of the Kydd Building, use the lift next to Security to reach level 2. Turn left and use the double doors near the TV.
Capacity | 20 |
---|---|
Type | Special IT Laboratory |
Layout | PC Workstations |
Available Software
Microsoft Visual Studio 2019 | |
Microsoft Visual Studio 2022 | |
Autodesk Motionbuilder 2023 | |
Autodesk Mudbox 2023 | |
Aseprite Aseprite (1.3) | |
Minecraft Minecraft Educational Edition | |
Adobe Adobe Suite 2023 | |
Autodesk 3DS Max 2024 | |
Autodesk Maya 2024 | |
Epic Games Unreal Engine 5.2 | |
Unity Technologies Unity Hub (3.5.0) | |
Unity Technologies Unity 2023.1.8f1 | |
Pixologic ZBrush (2022.0.7) |